Roller coaster engineers at Hershey Park play a crucial role in designing, maintaining, and ensuring the safety of thrilling attractions. These professionals combine mechanical engineering expertise with creative design skills to create unforgettable experiences for park visitors. From conceptualization to daily inspections, roller coaster engineers at Hershey Park are responsible for every aspect of these complex machines, adhering to strict safety standards and continuously innovating to provide cutting-edge entertainment.
What Are the Key Responsibilities of a Roller Coaster Engineer at Hershey Park?

Roller coaster engineers at Hershey Park have a diverse range of responsibilities:
- Design and Development
- Create proposals and layouts for new roller coasters
- Develop theme concepts that align with Hershey Park’s brand
-
Collaborate with other departments to ensure feasibility
-
Structural and Mechanical Engineering
- Design track layouts and support structures
- Ensure mechanical functionality of all ride components
-
Calculate load-bearing capacities and stress factors
-
Safety Compliance
- Work with state-certified amusement ride inspectors
- Adhere to ASTM and AWS standards
-
Implement and maintain safety protocols
-
Maintenance and Inspection
- Conduct regular inspections of all roller coaster components
- Oversee maintenance schedules and procedures
- Troubleshoot and resolve mechanical issues
What Qualifications Are Required for a Roller Coaster Engineer at Hershey Park?

To become a roller coaster engineer at Hershey Park, candidates typically need:
- A bachelor’s degree in mechanical engineering or a related field
- Strong problem-solving and analytical skills
- Experience in drafting, design, and construction
- Knowledge of safety regulations and inspection protocols
- Proficiency in CAD software and simulation tools
How Does the Roller Coaster Design Process Work at Hershey Park?
The design process for roller coasters at Hershey Park involves several stages:
- Conceptualization
- Brainstorming ideas for new attractions
-
Considering park layout and available space
-
Engineering Design
- Using CAD software to create detailed designs
-
Calculating forces, speeds, and g-forces
-
Simulation and Testing
- Running computer simulations to test ride dynamics
-
Building scale models for physical testing
-
Construction Planning
- Developing construction timelines and budgets
-
Coordinating with contractors and suppliers
-
Implementation
- Overseeing the construction process
- Conducting rigorous testing before opening to the public
What Safety Standards and Protocols Are Followed at Hershey Park?
Hershey Park adheres to strict safety standards and protocols for its roller coasters:
Standard/Protocol | Description |
---|---|
ASTM Standards | Follows guidelines set by the American Society for Testing and Materials |
AWS Standards | Adheres to American Welding Society standards for structural integrity |
Daily Inspections | Multiple teams inspect different aspects of each ride daily |
Preventive Maintenance | Regular maintenance performed based on ride-specific checksheets |
Nondestructive Testing | Used to ensure integrity of welds and critical components |
What Unique Challenges Do Roller Coaster Engineers Face at Hershey Park?
Roller coaster engineers at Hershey Park encounter several unique challenges:
- Weather Considerations
- Designing rides to withstand Pennsylvania’s varied climate
-
Accounting for temperature fluctuations and their effect on materials
-
Space Constraints
- Integrating new attractions into the existing park layout
-
Maximizing thrills within limited space
-
Noise Reduction
- Minimizing noise pollution for nearby residential areas
-
Designing quieter ride components and structures
-
Energy Efficiency
- Implementing energy-saving technologies in ride systems
-
Balancing power consumption with ride performance
-
Accessibility
- Ensuring rides are accessible to a wide range of visitors
- Designing safety features that accommodate various body types
How Long Does It Take to Develop a New Roller Coaster at Hershey Park?
The development of a new roller coaster at Hershey Park typically follows this timeline:
- Concept Development: 3-6 months
- Detailed Design: 6-9 months
- Approval and Permitting: 2-3 months
- Construction: 6-12 months
- Testing and Certification: 1-2 months
Total time from concept to opening: Approximately 18-32 months
What Software and Tools Do Roller Coaster Engineers Use at Hershey Park?
While specific software used at Hershey Park is not publicly disclosed, roller coaster engineers typically utilize:
- AutoCAD for 2D and 3D design
- SolidWorks for 3D modeling and simulation
- NoLimits Roller Coaster Simulation for ride physics testing
- Finite Element Analysis (FEA) software for structural analysis
- Custom in-house software for park-specific calculations and simulations
How Do Roller Coaster Engineers at Hershey Park Ensure Continuous Innovation?
To stay at the forefront of roller coaster technology, engineers at Hershey Park:
- Attend industry conferences and trade shows
- Collaborate with academic institutions on research projects
- Study advancements in materials science for stronger, lighter components
- Explore virtual and augmented reality technologies for enhanced rider experiences
- Analyze rider feedback and industry trends to inform future designs
By combining cutting-edge engineering with a deep understanding of guest experiences, roller coaster engineers at Hershey Park continue to create thrilling and safe attractions that keep visitors coming back year after year.
References:
1. https://engineeringonline.ucr.edu/blog/theme-park-engineer-jobs/
2. https://www.fabtechexpo.com/blog/2018/06/08/maintenance-at-hersheypark-ensures-sweet-safe-rides
3. https://nojoeschmo.com/2011/08/08/the-roller-coaster-engineer/